|
How to tie up to a mooring
I think the best way to tie off to a mooring line is to run a dock line through it and cleat off each end at the bow. Or you could tie off one end of the dock line, run the other end through the mooring line loop and then cleat that end off on the bow. Releasing from the mooring is as simple as uncleating the dockline and pulling it in from the other end.
|