|
Agree with Dawg and some of the others that you have a chocked filled float plan with little room for error. What if things happen (not that that EVER happens on a long cruise of course) and you have to add 2-3 days at the end because of weather or gear issues? Disaster for some of your colleagues or not?
BTW -- I've made the first part of this trip from Rock Creek to Cape May (then we headed south to Norfolk for a circumnavigation of the Delmarva). First day to Chesapeake City, second day to Cape May. Then 36 hours to Norfolk. Great trip, but I had to do it in 8 days and next time I'd like to take at least 14 to linger on the trip north up the bay.
__________________
SailorMitch Sailing winged keels since 1989.
1.20.09 Bush's last day the end of an error !! Hopefully we still have a constitution and economy left by then.
"Compassion and tolerance are not a sign of weakness, but a sign of strength." The Dalai Lama
good planets are hard to find-- a song by steve forbert
I have but one lamp by which my feet are guided, and that is the lamp of experience. I know no way of judging the future but by the past.-- Patrick Henry.
|