View Single Post
  #28 (permalink)  
Old 06-24-2008
rvrdgn rvrdgn is offline
Junior Member
 
Join Date: Aug 2003
Posts: 6
Rep Power: 0
rvrdgn is on a distinguished road
Three years ago I had to replace a 3'x3' section of my cabin top due to rotten core. I cut through the top and dug out as much rot as I could find. I cut 1/4" x 2" strips of marine grade ply and lay them fore and aft and the second layer port to starboard. I pored epoxy over each layer filling in all of the gaps. After the epoxy hardened, I epoxied fiberglass matte over the plywood to match the rest of the deck. I haven't had a leak or any visible problems since. This project took about 2 weeks. If you want to see the pictures I took during the project, let me know.
Reply With Quote Share with Facebook