First things first, you guys have been very helpful and informative, I feel like I am ready to move forward on the project and will do it entirely over a 24 hour period as soon as I can get down there. And, I am still going to use the MAS product.
I never got a return phone call from Tony. He doesn't owe me or have any duty or obligation to answer every low end user phone call he gets. I still don't know the answer as to how much I'll probably need and equally important, which catalyst to use in August. So, I'll get the slow stuff and pace myself. I am figuring on a total of three gallons of resin to do six coats. It mixes 2:1 so that ought to be beau coups product for a full keel 36 footer with 24' at the water
line.
I'll make some pictures as the project comes along for future reference.