
09-15-2008
|
|
.
|
|
Join Date: Nov 2006
Posts: 10,861
Rep Power: 10
|
|
Quote:
Originally Posted by GaryHLucas
Giu,
There is something wrong with your statement that 1mm of stretch = 5% of breaking load. This has to be 1mm of stretch per 1 meter of length, or some other ratio. I used to build a system that used a 1/4" cable 800 feet long. Proper tension on that system was to stretch the cable 8 FEET!
|
Maybe it was the way I wrote it.
Quote:
Originally Posted by Giulietta
c) Now for the main shrouds, if you don’t have a Loos, or are just a cheap person, you can use a measuring tape. I did for many years.
You will need to attach a tape of at least 2 meters to the shroud, so that the zero or the beginning of the tape starts at the turnbuckle.
The rule is simple each 1mm of stretch means 5% of the breaking load, and that is valid for ANY CABLE IN A SHROUD, no matter what the diameter is!!!
|
|