I'm looking for a little insight from some of the EE types.

We have a house bank consisting of four T-105s. Our power panel has digital multi-meter connected to the house bank negative lead via a 500A shunt. I'm looking to install a Link 10 to better monitor the house bank, which also has a 500A shunt. The questions are:

1. Do I place the Link 10 shunt in series with the existing shunt; or

2. Can I just wire the Link 10 leads to the existing shunt (in parallel with the multi-meter)?

Thanks for your help, and happy sailing!