SailNet Community - View Single Post - starting work on a 67 challenger
View Single Post
post #1 of Old 05-13-2009 Thread Starter
slrrls2000
Junior Member
 
slrrls2000's Avatar
 
Join Date: May 2009
Posts: 10
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
 
starting work on a 67 challenger

I'm just starting work on a challenger.
Looking in the bow (V birth) I see a large tank and two drain pipes.
Wonder if someone can answer my questions.
Facing forward to the bow of the boat the tank is in front of the two pipes.
Looks like a 10 to 20 gal I can't tell for sure.
Large pipe is on the left and smaller pipe is on the right.
The hose from the tank feeds back to the right and just past (galley way?). Then there is a large whole (hand size) in the birth with another drain pipe at this point.
My impression is that the tank is for drinking and flushing the toilet.
That a toilet would exit into the large drainpipe on the left while I'm not sure of the use for the drain pipe on the right. Then the hose that feeds through the galley way would feed to a sink that would rest at the large hand sized hole through the birth and that the drain pipe in that location would be for the sink to drain out.
slrrls2000 is offline  
Quote Share with Facebook
 
 
For the best viewing experience please update your browser to Google Chrome