SailNet Community - View Single Post - Free O Day - How bad is too bad ? ? ?
View Single Post
  #16  
Old 04-23-2010
merc2dogs merc2dogs is offline
Senior Member
 
Join Date: Jun 2004
Location: West Michigan
Posts: 515
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 11
merc2dogs is on a distinguished road
The project duration depends a lot of work habits.
I've seen paint and varnish projects stretched out to a year, and have seen complete rebuilds take a few weeks.

As for power washing below decks, I use plenty of water below, garden hose power washer etc.
Most often I drill a 3/4 inch hole in the lowest point of the hull, or if there's a through hull in a suitable location, I just remove that. If you don't want to drill, a sump pump and shop vac gets rid of the water.

Sails are the critical thing as to deciding the worth of the project, without sails it's just a swim platform no matter how good it looks.

From the pics, I'd be dragging it home. But I enjoy project boats, sometimes I think I enjoy the projects just as much, or as I do sailing them. (typically don't keep a ready to sail boat too long after it's done)

Ken
Reply With Quote Share with Facebook