Hey guys,

I'm the new owner of a 1979 C-22. I have a few (haha) questions about the rigging. I've taken photos so that you can see what I'm talking about.

In the below image, does this look like the correct rigging for the mainsheet? It seems to work well when I swing the boom out, etc. And I like that it could be adjusted from either end.


-

In the below image, I'm showing the jib lines. Does it seem to be routed correctly? Also, the thin line is the jib downhaul. Where would you cleat it?
Would you rather these two lines be placed by the jib halyard and all be controlled there?



-

In the below two images, I'm looking at the clew of the main sail. The line runs through a pulley at the end of the boom and then runs along the boom to a weird kind of non-moving cam (I don't know the name of this thing.) It looks like this is a line I can pull to "stretch the foot" of the sail.





-

In the below two images, I'm looking at a pulley that hangs off the aft part of the mast. I'm guessing this pulley has a line that runs to the pulley on the boom (in the second picture.) If this is somewhat correct, I can't seem to figure out how to tie the line off. It's just some pulleys.





-

In the below two images, I'm looking at a line that is hanging off the leach of the main sail. It's a long line, and I don't know what to do with it. I guess it is for reefing. I'm also showing a picture of the boom where a pulley sits that I pulled the line through. Where would it go after that?





-

Lastly, in the below image, I'm looking at a line hanging off the main sail. Again, I have no idea where this would run to.



Thank you kindly for any input!

RG
Reply With Quote Share with Facebook