SailNet Community - View Single Post - I-28 Keel stub construction?
View Single Post
  #14  
Old 11-14-2010
Mark15 Mark15 is offline
Junior Member
 
Join Date: Nov 2010
Posts: 3
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
Mark15 is on a distinguished road
Down,

Iím glassing over and finishing all the fiberglass surfaces, I want to see the structure of the boat not cover it up. Inside the head Iíll finish the surfaces smooth and use a two-part paint system. In the other areas Iím not going to try to smooth things up much more than is shown in the pictures Ė will probably use a high build epoxy primer followed by a satin one-part top coat. The sole will be finished smooth and painted with a two-part paint system with some sort of non-skid.

The mast step was rebuilt using solid fiberglass for the section of sole and the floor beam below the compression post.

Mark
Attached Images
File Type: jpg boat 4.JPG (49.3 KB, 50 views)
File Type: jpg boat 5.jpg (35.6 KB, 49 views)
File Type: jpg boat 6.jpg (44.4 KB, 49 views)
File Type: jpg boat 7.JPG (54.3 KB, 48 views)
Reply With Quote Share with Facebook