SailNet Community - View Single Post - Beneteau First 42 Manual
View Single Post
  #10  
Old 02-29-2012
Letrappes's Avatar
Letrappes Letrappes is offline
Senior Member
 
Join Date: Apr 2010
Location: Lake Charles, LA
Posts: 132
Thanks: 0
Thanked 3 Times in 3 Posts
Rep Power: 5
Letrappes is on a distinguished road
Thanks again. That's what I was looking for. I'm missing a secondary main and jib halyard so will have to rig those in the future when I go up the mast. Also, when you say secondary jib halyard, is that masthead or down lower? I have two sheaves below the streaming light on the mast. One is a few inches above the other and neither are direct centerline. One i'm sure is for the spinnaker pole lift. The other I believe is for a staysail or storm jib which can be rigged on my removable inner forestay. I'm wondering if this it's what you mean by secondary jib halyard. I was thinking to raise a second jib on the foil I would use the secondary spinnaker halyard before I peeled the first away.

I like how you've run the checkstays. Mine currently has a four to one fiddle system in place and I was thinking of going to the way you suggested which is how we ran an Express 37 I raced on. One tackle would go to the foreguy and the second could go to the boom preventer.

Do you still have the Perkins 4.108 in it?
Reply With Quote Share with Facebook