SailNet Community - View Single Post - Aluminum toe rail leak?
View Single Post
  #7  
Old 11-04-2012
reed1v reed1v is offline
Junior Member
 
Join Date: Apr 2010
Location: southport, me
Posts: 26
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
reed1v is on a distinguished road
Re: Aluminum toe rail leak?

Quote:
Originally Posted by deluxe68 View Post
Any idea just how expensive?
depends. for a 40 footer probably 40-60k if the entire deck and hull need to be reattached. el cheapo way would be another alum. rail bolted down. better is a stainless rail. the flange probably stressed and may need to be epoxy bonded before mechanical tie down. would be a good idea anyhow. that would ensure against leaks. all options very labor intensive. if your going to redo the bond, probably worth 10k more to design a higher rail for better life line stanchion holding and for more foot support. good luck. btw: examined a hudson 50 . its hull/deck bond was nothing more than a bunch of plywood boards glued to the hull and deck. that was it.
Reply With Quote Share with Facebook