SailNet Community - View Single Post - Windlass Installation
View Single Post
post #11 of Old 12-30-2012 Thread Starter
Senior Member
windyway's Avatar
Join Date: Nov 2008
Location: West coast lower mainland British Columbia, Canada
Posts: 261
Thanks: 1
Thanked 2 Times in 2 Posts
Rep Power: 8
Windlass Installation Finally Done!

Well the windlass is finally done! A bigger job than I thought. Pictures below are from the finished work. Solenoids are placed beside the windlass motor in the FWD stowage upper port side. The 3" white pipe ended up to be at an angle of 11 deg & was 30" long under the FWD settee. You can see the rope exiting this pipe from the cockpit if the cover is left off this stowage area. The rope does not bind up in the pipe but does stop once the pile gets too high so I have to jump inside & scoop the pile AFT. But it works great to my relief
Attached Images
File Type: jpg -Windlass Sol.jpg (51.6 KB, 19 views)
File Type: jpg -Windlass Pipe1.JPG (86.0 KB, 22 views)
File Type: jpg -Windlass Pipe2.jpg (59.7 KB, 21 views)
File Type: jpg -WindlassCmplt.jpg (49.8 KB, 24 views)
windyway is offline  
Quote Share with Facebook
For the best viewing experience please update your browser to Google Chrome