Replacing Halyards - Page 2 - SailNet Community

   Search Sailnet:

 forums  store  


Quick Menu
Forums           
Articles          
Galleries        
Boat Reviews  
Classifieds     
Blogs               
Search SailNet 
Boat Search (new)

Shop the
SailNet Store
Anchor Locker
Boatbuilding & Repair
Charts
Clothing
Electrical
Electronics
Engine
Hatches and Portlights
Interior And Galley
Maintenance
Marine Electronics
Navigation
Other Items
Plumbing and Pumps
Rigging
Safety
Sailing Hardware
Trailer & Watersports
Clearance Items









Go Back   SailNet Community > General Interest Forums > Gear & Maintenance
 Not a Member? 



Reply
 
LinkBack Thread Tools Search this Thread
  #11 (permalink)  
Old 04-23-2004
Junior Member
 
Join Date: Dec 2003
Posts: 10
Rep Power: 0
mcycles is on a distinguished road
Replacing Halyards

I have the same situation you do. ''82 Dehler DB1 3/4 ton IOR boat, very tapered fractional bendy mast, and a bank of 3 sheaves for the center jib and 2 wing wire halyards. All the jib halyards were fraying badly and needed replacing.

I checked the sheaves and they are not the U-channel groove style suitable for only wire, nor are they abraded badly... and my 8mm (5/16") Validator II replacement line appears to fit nearly perfectly in them... which means it is probably larger than optimal size for that sheave diameter. The old wire halyards were 3/16".

Still, I am going to run it for this summer season and see how things go. I tied on my shackles w/ buntline hitches, the line strength is rated at over twice what the old (and fraying) wire was, so I anticipate no problems with that. I am not stripping the cover, mainly for longevity but also for added protection since i''m not absolutely certain there will be no chafe issues.
Reply With Quote Share with Facebook
  #12 (permalink)  
Old 04-23-2004
Junior Member
 
Join Date: Dec 2003
Posts: 10
Rep Power: 0
mcycles is on a distinguished road
Replacing Halyards

I have the same situation you do. ''82 Dehler DB1 3/4 ton IOR boat, very tapered fractional bendy mast, and a bank of 3 sheaves for the center jib and 2 wing wire halyards. All the jib halyards were fraying badly and needed replacing.

I checked the sheaves and they are not the U-channel groove style suitable for only wire, nor are they abraded badly... and my 8mm (5/16") Validator II replacement line appears to fit nearly perfectly in them... which means it is probably larger than optimal size for that sheave diameter. The old wire halyards were 3/16".

Still, I am going to run it for this summer season and see how things go. I tied on my shackles w/ buntline hitches, the line strength is rated at over twice what the old (and fraying) wire was, so I anticipate no problems with that. I am not stripping the cover, mainly for longevity but also for added protection since i''m not absolutely certain there will be no chafe issues.
Reply With Quote Share with Facebook
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
replacing fuel tanks newby1018 General Discussion (sailing related) 0 05-01-2004 11:40 AM
Replacing a headliner bayme Gear & Maintenance 6 02-13-2003 05:56 AM
replacing deck non-skid gto2 Gear & Maintenance 4 08-22-2002 04:47 PM
Replacing Holding Tank ABullard Gear & Maintenance 1 08-15-2002 10:11 AM
replacing inboard engines rjk Gear & Maintenance 2 05-09-2001 08:29 AM


All times are GMT -4. The time now is 07:47 PM.

Add to My Yahoo!         
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.6.0
(c) Sailnet 2000-2006