Replacing Halyards - Page 2 - SailNet Community

   Search Sailnet:

 forums  store  


Quick Menu
Forums           
Articles          
Galleries        
Boat Reviews  
Classifieds     
Search SailNet 
Boat Search (new)

Shop the
SailNet Store
Anchor Locker
Boatbuilding & Repair
Charts
Clothing
Electrical
Electronics
Engine
Hatches and Portlights
Interior And Galley
Maintenance
Marine Electronics
Navigation
Other Items
Plumbing and Pumps
Rigging
Safety
Sailing Hardware
Trailer & Watersports
Clearance Items

Advertise Here






Go Back   SailNet Community > On Board > Gear & Maintenance
 Not a Member? 
  #11  
Old 04-23-2004
Junior Member
 
Join Date: Dec 2003
Posts: 10
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
mcycles is on a distinguished road
Replacing Halyards

I have the same situation you do. ''82 Dehler DB1 3/4 ton IOR boat, very tapered fractional bendy mast, and a bank of 3 sheaves for the center jib and 2 wing wire halyards. All the jib halyards were fraying badly and needed replacing.

I checked the sheaves and they are not the U-channel groove style suitable for only wire, nor are they abraded badly... and my 8mm (5/16") Validator II replacement line appears to fit nearly perfectly in them... which means it is probably larger than optimal size for that sheave diameter. The old wire halyards were 3/16".

Still, I am going to run it for this summer season and see how things go. I tied on my shackles w/ buntline hitches, the line strength is rated at over twice what the old (and fraying) wire was, so I anticipate no problems with that. I am not stripping the cover, mainly for longevity but also for added protection since i''m not absolutely certain there will be no chafe issues.
Reply With Quote Share with Facebook
  #12  
Old 04-23-2004
Junior Member
 
Join Date: Dec 2003
Posts: 10
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
mcycles is on a distinguished road
Replacing Halyards

I have the same situation you do. ''82 Dehler DB1 3/4 ton IOR boat, very tapered fractional bendy mast, and a bank of 3 sheaves for the center jib and 2 wing wire halyards. All the jib halyards were fraying badly and needed replacing.

I checked the sheaves and they are not the U-channel groove style suitable for only wire, nor are they abraded badly... and my 8mm (5/16") Validator II replacement line appears to fit nearly perfectly in them... which means it is probably larger than optimal size for that sheave diameter. The old wire halyards were 3/16".

Still, I am going to run it for this summer season and see how things go. I tied on my shackles w/ buntline hitches, the line strength is rated at over twice what the old (and fraying) wire was, so I anticipate no problems with that. I am not stripping the cover, mainly for longevity but also for added protection since i''m not absolutely certain there will be no chafe issues.
Reply With Quote Share with Facebook
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools

 
Posting Rules
You may post new threads
You may post replies
You may post attachments
You may edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On


Similar Threads
Thread Thread Starter Forum Replies Last Post
replacing fuel tanks newby1018 General Discussion (sailing related) 0 05-01-2004 10:40 AM
Replacing a headliner bayme Gear & Maintenance 6 02-13-2003 04:56 AM
replacing deck non-skid gto2 Gear & Maintenance 4 08-22-2002 03:47 PM
Replacing Holding Tank ABullard Gear & Maintenance 1 08-15-2002 09:11 AM
replacing inboard engines rjk Gear & Maintenance 2 05-09-2001 07:29 AM


All times are GMT -4. The time now is 01:51 PM.

Add to My Yahoo!         
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
SEO by vBSEO 3.6.1
(c) Marine.com LLC 2000-2012

The SailNet.com store is owned and operated by a company independent of the SailNet.com forum. You are now leaving the SailNet forum. Click OK to continue or Cancel to return to the SailNet forum.