
03-20-2004
|
|
Junior Member
|
|
Join Date: Feb 2004
Posts: 9
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
|
|
|
Clearance of 17St causeway bridge in Ft Lauderdale
According to the official website, the bridge is 55 ft. in the closed position. I have to believe that is the highest point and, therefore, is the center of the span. To check it out, see www.dot.state.fl.us/structures/botm/17thstreet.17thstreet.htm
Hope that helps.
|