I bought all new running rigging for my Macgregor Venture 25 but I haven't found any helpful information on how to set it up. I have never done this before, so does anyone know of any diagrams or just have any helpful advice?

Thanks
JMN412 is offline  
Quote Quick Reply Share with Facebook
Sponsored Links
Advertisement
 
post #2 of 13 Old 04-01-2013
Senior Member
 
bljones's Avatar
 
Join Date: Oct 2008
Location: South Coast Ontario
Posts: 8,480
Thanks: 35
Thanked 91 Times in 81 Posts
Rep Power: 8
   
Re: Running Rigging Installation

The halyards are simple- up and over the sheaves. the rest is pretty straighforward:





The manual can be found here:
http://macgregor.sailboatowners.com/...kb/pdf/647.pdf

This place is a great resource for macgregor/venture owners:

http://purplesagetradingpost.com/sum...r-links-1.html
jimgo likes this.

It's 5 o'clock somewhere:


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Last edited by bljones; 04-01-2013 at 01:09 AM.
bljones is offline  
Quote Quick Reply Share with Facebook
post #3 of 13 Old 04-01-2013
Senior Member
 
bljones's Avatar
 
Join Date: Oct 2008
Location: South Coast Ontario
Posts: 8,480
Thanks: 35
Thanked 91 Times in 81 Posts
Rep Power: 8
   
Re: Running Rigging Installation

Looking a little further through the interweb, i found this:
Untitled Document

it's a Venture 22, but i imagine the rig is damn near the same.

It's 5 o'clock somewhere:


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
bljones is offline  
Quote Quick Reply Share with Facebook
post #4 of 13 Old 04-01-2013
Senior Member
 
Join Date: Aug 2006
Location: Norway
Posts: 872
Thanks: 8
Thanked 67 Times in 62 Posts
Rep Power: 10
 
Re: Running Rigging Installation

Are you looking for a procedure to replace the existing?
If the new halyards have a splice in the end you must pull them through with the tail first.
Two methods
  1. Attach a messenger line to the tail of the old rope and pull the the messenger through, attach new rope to messenger and pull back.
  2. Cut off the old eye& shackle and attach the tail of new rope to the end of the rope and pull through.
I prefer option 1 as you get the old rope out without cutting it.

To attach the messenger (or new rope) to the old one I prefer using whipping twine and a needle making several loops and securing with double sheet bend.

Some make the tail of the rope with a reeving eye, making attachment of messenger line easier.
The reeving eye is not load a load bearing eye, but it is not increasing the diameter of the rope so it can pass through sheaves, blocks and clutches.
Picture of a reeving eye with reeving needle (used to thread the line through clutches)
knuterikt is offline  
Quote Quick Reply Share with Facebook
post #5 of 13 Old 04-01-2013 Thread Starter
Member
 
JMN412's Avatar
 
Join Date: Mar 2012
Location: Virginia
Posts: 41
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
 
Running Rigging Installation

The old line was completely cut off the boat, so I am starting from scratch basically
JMN412 is offline  
Quote Quick Reply Share with Facebook
post #6 of 13 Old 04-01-2013
Senior Member
 
Join Date: Aug 2006
Location: Norway
Posts: 872
Thanks: 8
Thanked 67 Times in 62 Posts
Rep Power: 10
 
Re: Running Rigging Installation

Quote:
Originally Posted by JMN412 View Post
The old line was completely cut off the boat, so I am starting from scratch basically
So no messenger lines in the mast?
Mast off the boat?
Internal halyards?

If the answer is yes to all three
It helps making clear questions

You need to get hold of piece of stiff thin wire, same length as the mast (used rigging wire is OK)
  • Turn the mast on one side (port).
  • Insert the wire in one of the top sheaves that is going to exit on the port side.
  • Fish out the wire at the correct exit hole.
  • Attach a thin messenger line to the wire.
  • Pull the messenger line through.
  • Tie off on end of the messenger line
  • Tighten the other end of the messenger line and tie off.
  • Repeat for all lines on port side
  • Turn the mast on the other side & repeat
It's important that that all the messenger lines get a fair lead with no crossing s and twists inside the mast.

I have seen other methods of getting the messenger line in place decribed (using strong magnet is one)

When all messenger lines are in place pull inn the new lines as described in my previous post.
knuterikt is offline  
Quote Quick Reply Share with Facebook
post #7 of 13 Old 04-01-2013
Learning a bit every day
 
FinallySailing's Avatar
 
Join Date: Feb 2013
Location: Essex, UK
Posts: 214
Thanks: 5
Thanked 4 Times in 4 Posts
Rep Power: 3
 
Re: Running Rigging Installation

You might want to invest in electricians' fish tape or fiberglass access rods to fiddle your messenger lines through. They will also be extremely useful if you are planning to rewire your boat .

FinallySailing is offline  
Quote Quick Reply Share with Facebook
post #8 of 13 Old 04-01-2013
Senior Member
 
Join Date: Aug 2006
Location: Norway
Posts: 872
Thanks: 8
Thanked 67 Times in 62 Posts
Rep Power: 10
 
Re: Running Rigging Installation

Quote:
Originally Posted by FinallySailing View Post
You might want to invest in electricians' fish tape or fiberglass access rods to fiddle your messenger lines through. They will also be extremely useful if you are planning to rewire your boat .

Problem with these (at least the one's i have) is that they have a tendency to curl - not a problem going into a conduit, but can be difficult inside a mast.
knuterikt is offline  
Quote Quick Reply Share with Facebook
post #9 of 13 Old 04-01-2013
Over Hill Sailing Club
 
smurphny's Avatar
 
Join Date: Feb 2009
Location: Adirondacks NY
Posts: 3,554
Thanks: 89
Thanked 106 Times in 103 Posts
Rep Power: 7
 
Re: Running Rigging Installation

A fishtape should be required equipment on all sailboats:-) It comes in handy many times for a number of things. Getting wiring, tubing, etc. through the small openings on sailboats is often facilitated by having one on board, not to mention the uses getting things in and out of the mast. I've even taped nuts to the end to snake them up inside masts in order to grab from the outside. They are also handy for snaking wiring and new cables up into a pedestal. It often requires trial and error to get the first 12" or so bent just right but you can always make them work. They are also very handy to grab things that are stuck if you twist and wrap.

Alberg 35: With a philosophical flourish Cato throws himself upon his sword; I quietly take to the ship.
smurphny is offline  
Quote Quick Reply Share with Facebook
post #10 of 13 Old 04-02-2013 Thread Starter
Member
 
JMN412's Avatar
 
Join Date: Mar 2012
Location: Virginia
Posts: 41
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
 
Re: Running Rigging Installation

The boat is a 1978 so I am pretty sure we only have external halyards, but like I said the old line was cut off so I don't know for sure.
JMN412 is offline  
Quote Quick Reply Share with Facebook
Reply

Tags
macgregor , running rigging

Quick Reply
Message:
Options

By choosing to post the reply above you agree to the rules you agreed to when joining Sailnet.
Click Here to view those rules.

Register Now



In order to be able to post messages on the SailNet Community forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.
Please note: After entering 3 characters a list of Usernames already in use will appear and the list will disappear once a valid Username is entered.


User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.

Password:


Confirm Password:
Email Address
Please enter a valid email address for yourself.

Email Address:
OR

Log-in









Human Verification

In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page



Similar Threads
Thread Thread Starter Forum Replies Last Post
C30 running rigging stumartell Gear & Maintenance 1 12-22-2010 01:17 AM
New running rigging PaulinVictoria General Discussion (sailing related) 2 08-02-2010 09:01 PM
Running Rigging rneaul General Discussion (sailing related) 2 07-06-2010 10:00 AM
Acceptable installation of rigging terminals royt Gear & Maintenance 2 02-06-2008 09:11 AM
Cal T4 Running Rigging pdxphil Gear & Maintenance 2 07-20-2002 01:31 PM

Posting Rules  
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On

 
For the best viewing experience please update your browser to Google Chrome