Do you have an "A" or "C" plan? I have a "C" with the icebox just inside the companionway where the nav station is on an "A".
Being that the icebox is next to the engine compartment on a "C" plan, the drain
line is plumbed inside the engine compartment. I flip up the top step where the drain plumbing terminates. I have a jabsco hand
pump that connects to the ice box drain
line, and just hand
pump it into the cockpit.
This is the jabsco
pump i use:
I also have two foot
pumps, one fresh and one sea water. If i wanted to, i would plumb a "T" and a ball valve into the suction side of the sea water
pump. Then to drain the box, just shut the sea water seacock, open the drain valve and
pump. I would not plumb to my fresh water
pump though because that might contaminate the fresh water supply with rotten nasties from the icebox.