masthead box - SailNet Community
 
LinkBack Thread Tools
post #1 of 3 Old 08-18-2009 Thread Starter
Senior Member
 
Join Date: Jan 2001
Posts: 158
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 15
 
masthead box

My jib halyard has just started jamming at the masthead. Looking at the top with binos I can see that the bracket on the forward side of the mast has a noticeable bulge, maybe an eight inch or so, but enough to let the halyard mislead and jam.
Question is how to repair? Can the old box be ground out and a new one welded in? Or a new box added to the top of the existing mast? Or wait till fall when I drop the mast and squeeze the bracket back to shape and have a brace welded on?
Anyone have this problem before?
Any thoughts are appreciated.
Luckily I can still hoist the jib with the the spin halyard, so the season isn't done yet.

Edit to add that this is a Ranger 26.

Thanks

Last edited by BigZ; 08-19-2009 at 04:41 PM.
BigZ is offline  
Quote Quick Reply Share with Facebook
Sponsored Links
Advertisement
 
post #2 of 3 Old 03-31-2010
Junior Member
 
Join Date: Mar 2010
Posts: 4
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0
 
Masthead sheave repair

Big Z. Did you fix your masthead crane issue?
MoAir is offline  
Quote Quick Reply Share with Facebook
post #3 of 3 Old 04-04-2010 Thread Starter
Senior Member
 
Join Date: Jan 2001
Posts: 158
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 15
 
Actually, when I dropped the mast and got a close-up view I found that there wasn't any bulging or real deformation at the masthead. There was a bit of wear from the original wire halyards on the inner side of the extension that, from ground level, gave more an illusion of a bulge.


The real jamming problem was due to the rope halyard getting old and increasing a bit in diameter. The extra bit of diameter was enough that the halyard could jam against the toggle where the forestay attached to the masthead. The original clearances were fine for wire, but the 3/8 rope was too close. And the jamming wouldn't occur when the halyard was pulled straight up/down; only when the angle tracked the forestay.



I changed the forward genoa sheave to a smaller diameter and dropped to a 5/16 halyard. I think this will prevent the jamming.
BigZ is offline  
Quote Quick Reply Share with Facebook
Reply

Quick Reply
Message:
Options

By choosing to post the reply above you agree to the rules you agreed to when joining Sailnet.
Click Here to view those rules.

Register Now



In order to be able to post messages on the SailNet Community forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.
Please note: After entering 3 characters a list of Usernames already in use will appear and the list will disappear once a valid Username is entered.


User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.

Password:


Confirm Password:
Email Address
Please enter a valid email address for yourself.

Email Address:
OR

Log-in









Human Verification

In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page



Similar Threads
Thread Thread Starter Forum Replies Last Post
Refrigeration—Part I Tom Wood Gear and Maintenance Articles 0 04-28-2003 08:00 PM
Installing 12-Volt Refrigeration Sue & Larry Gear and Maintenance Articles 0 06-18-2002 08:00 PM

Posting Rules  
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

 
For the best viewing experience please update your browser to Google Chrome