
10-10-2010
|
|
Junior Member
|
|
Join Date: Aug 2010
Posts: 3
Rep Power: 0
|
|
|
s2 11a deck - balsa core/glass at stanchions
Fellow Members,
I would like to know if anyone knows the deck structure for the 11a well enough to tell me if
1. the bala core deck ends at X inches before the stanchions/toe rail and is solid glass OR
2 does the balsa core deck extend to to the toerail itself
Some production manufacturers stopped balsa coring about 5 inches before toe rail and used pure glass at this point and not sure if S2 did something similar.
|