Search Sailnet:

 forums  store  


Quick Menu
Forums           
Articles          
Galleries        
Boat Reviews  
Classifieds     
Blogs               
Boat Search (new)






Go Back   SailNet Community > General Interest Forums > Seamanship
User Name
Password
 Not a Member? 


Reply
 
LinkBack Thread Tools Search this Thread
 Like this article?  Digg It!  or   Bookmark it!
  #1 (permalink)  
Old 06-25-2009
chandlerman chandlerman is offline
Member
 
Join Date: Apr 2008
Location: Chicago, IL, USA
Posts: 52
Rep Power: 2
chandlerman is on a distinguished road
spinnaker w/o a topping lift for the pole?

Can anyone advise me on whether or not there's a feasible method of flying a symmetrical spinnaker without a topping lift for the pole?

I don't have a topping lift for the spinnaker pole on my C&C 35, but I've only used a pole with the lift and have been told that it's necessary to have one.

My problem is that I would like to be able to both fly the kite, but I'm lazy so I'd like to avoid dropping the genoa to gain its halyard for use as a topping lift if at all possible.

Can anyone provide thoughts, advice, or confirm that dropping the genoa really is my only option?

Thanks!
__________________
"Urban Legend"
1972 C&C 35' Mk I
Belmont Harbor, Chicago, IL
Reply With Quote
  #2 (permalink)  
Old 06-25-2009
sailingfool sailingfool is offline
ASA and PSIA Instructor
 
Join Date: Apr 2000
Posts: 2,048
Rep Power: 10
sailingfool will become famous soon enough
You can fly a spinnaker using a pole without a lift but getting the sail full and gybing would be a bit messy. The lift's role obviously is to raise the pole to horizontal, however, once the spinnaker is set and pulling with any breeze, the spinnaker wants to raise the pole anyway...the fore and aft guys serve to keep the pole from rising above horizontal - when the spinnaker is pulling, the lift may only matter in lulls where it keeps the pole fromtrying to droop the luff.

That said, working without a lift will be messy, plus spinnaker poles can be subject to strong loads, and are best kept under tight control, not having a lift loses one of available control lines. I wouldn't do it on an ongoing basis.
__________________
Certified...in several regards...
Reply With Quote
  #3 (permalink)  
Old 06-25-2009
chandlerman chandlerman is offline
Member
 
Join Date: Apr 2008
Location: Chicago, IL, USA
Posts: 52
Rep Power: 2
chandlerman is on a distinguished road
OK...so that sounds not entirely unlike what I was already thinking, which is basically that, "yeah, it's do-able, but probably not the best idea anyone has ever had."

thanks a lot.
__________________
"Urban Legend"
1972 C&C 35' Mk I
Belmont Harbor, Chicago, IL
Reply With Quote
Sponsored Ad
  #4 (permalink)  
Old 06-25-2009
Calabego's Avatar
Calabego Calabego is offline
45.63N 122.67W
 
Join Date: Nov 2008
Location: Vancouver, WA
Posts: 47
Rep Power: 0
Calabego is on a distinguished road
It will also have a tendancy to deflate the chute when the wind is so light as to be overcome by the pole's weight. Heavy enough wind, and well, it'd be doable. I'd want two foredeck guys to manhandle it without a lift during a gybe though. So, consistant 10 kts wind or so, extra crewman very dialed gybing technique and I could see it working.
__________________
Signature picture courtesy of Cal20 Class Assn.
Reply With Quote
  #5 (permalink)  
Old 06-25-2009
GeorgeB GeorgeB is offline
Senior Member
 
Join Date: Dec 2004
Location: San Francisco Bay
Posts: 313
Rep Power: 5
GeorgeB is on a distinguished road
You need that topping lift to both hold the weight of the pole and to stabilize it as a spar. You need to be able to adjust the tip end for variations in wind speed. That is how you keep the clews level. Without the ability to stabilize the pole, you will not be able to effectively “choke down” the sail if the wind picks up too much. You will not be able to gybe the boat. The topping lift has to support the weight of the pole in both the dip-pole and the end-for-end gybes. Once you release the halyard for the douse, the pole tip will come crashing down to the forepeak or pulpit. You could go without a topping lift – it will be messy and you do run a real risk of seriously injuring your bowman. I suggest he wear a climbing helmet and you increase your insurance coverage.
Reply With Quote
  #6 (permalink)  
Old 06-25-2009
chandlerman chandlerman is offline
Member
 
Join Date: Apr 2008
Location: Chicago, IL, USA
Posts: 52
Rep Power: 2
chandlerman is on a distinguished road
Thanks to everyone for their inputs. Given that I have neither a top-notch foredeck crew (sorry, guys, but I know you know it too ), a death wish, nor a desire to increase my insurance needs, I'll just stick with what I already knew suspected.

Like I said originally, I wanted to confirm my past experience and understanding that the pole is necessary, I was just hoping-against-hope that I might be able to avoid having to drop and then re-hoist the genoa if we want/need to fly the kite.
__________________
"Urban Legend"
1972 C&C 35' Mk I
Belmont Harbor, Chicago, IL
Reply With Quote
  #7 (permalink)  
Old 06-25-2009
Gary M's Avatar
Gary M Gary M is offline
Senior Member
 
Join Date: May 2006
Location: Sarnia ON
Posts: 415
Rep Power: 4
Gary M is on a distinguished road
Do you only have one jib halyard ? If you have two jib halyards then use one of those for your topping lift, that is quite common. If you only have one there is going to be another sheeve for a second so maybe you should add one instead of the topper.

That way you have a spare jib of spin halyard if needed.

Now that I think about it perhaps your boat did not have factory spin gear so you are using the second jib halyard for the spin. In that case I think the spin halyard is run to a seperate block at the mast head on a bit of an extension. You may have to go that route.

Gary

Last edited by Gary M : 06-25-2009 at 08:15 PM.
Reply With Quote
  #8 (permalink)  
Old 06-25-2009
chandlerman chandlerman is offline
Member
 
Join Date: Apr 2008
Location: Chicago, IL, USA
Posts: 52
Rep Power: 2
chandlerman is on a distinguished road
I've got two halyards, one for the jib and one for the spinnaker, so I have to drop the jib off the furler (big PITA) to free up its halyard to use for the lift.

I I have a spare sheave and mast opening which is intended to be for a spare main halyard (I assume--I've never gone up and checked) but which is currently un-rigged. Historically, I've used a combination of messenger lines and prayer to avoid either losing my halyard up the mast or a broken line. After all, it's only Lake Michigan, so worst-case scenario is losing my main 40 miles off shore.

Alternately, there's an opening on the front of the mast at about the right height for the topping lift block but which currently has a plate over it, and I haven't really taken a look at it yet, either.
__________________
"Urban Legend"
1972 C&C 35' Mk I
Belmont Harbor, Chicago, IL
Reply With Quote
  #9 (permalink)  
Old 06-26-2009
Faster's Avatar
Faster Faster is offline
Moderator
 
Join Date: Sep 2005
Location: New Westminster, BC
Posts: 4,226
Rep Power: 6
Faster has a spectacular aura aboutFaster has a spectacular aura about
It's not that difficult to rig a pole lift - esp if you're happy to have it all external. It could be mounted as low on the mast as the spreader height. In fact if you don't want to drill holes you could lash a block to the spreader roots.

Flying the spinnaker in light air will be virtually impossible without a easily workable pole lift (adjustable from the cockpit is best). In heavier air the sail will support the pole, but as suggested above gybing cleanly will be much more difficult.
__________________
Boating in BC waters since the '60s, sailing since 1981.
Currently on our 5th boat, a 1984 Fast/Nicholson 345.
Reply With Quote
  #10 (permalink)  
Old 06-26-2009
chandlerman chandlerman is offline
Member
 
Join Date: Apr 2008
Location: Chicago, IL, USA
Posts: 52
Rep Power: 2
chandlerman is on a distinguished road
Quote:
Originally Posted by Faster View Post
It's not that difficult to rig a pole lift - esp if you're happy to have it all external. It could be mounted as low on the mast as the spreader height. In fact if you don't want to drill holes you could lash a block to the spreader roots.
Now that's a suggestion I can use. It also teaches me to quit over-engineering things.

I may even bite the bullet and pay West Marine prices to get it going ASAP since I've got a reasonable likelihood of needing it on a trip that kicks off tomorrow...
__________________
"Urban Legend"
1972 C&C 35' Mk I
Belmont Harbor, Chicago, IL
Reply With Quote
Reply



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Spinnaker Takedown Basics Dean Brenner Racing Articles 0 04-28-2002 09:00 PM
Spinnaker Fundamentals Steve Colgate Learning to Sail Articles 0 06-24-2000 09:00 PM
Spinnaker Fundamentals Steve Colgate Seamanship Articles 0 06-24-2000 09:00 PM
Spinnaker Fundamentals Steve Colgate Gear and Maintenance Articles 0 06-24-2000 09:00 PM
Spinnaker Fundamentals Steve Colgate Racing Articles 0 06-24-2000 09:00 PM

Page generated in 0.7725 seconds (73.41% PHP - 26.59% MySQL) with 15 queries
Add to My Yahoo!         
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.0.0 RC8
(c) Sailnet 2000-2006