Joined
·
13,619 Posts
- Reaction score
- 2,046
"Fully rested" would mean 8-24 hours.
Meters can have a float of +-2 or 3 LSD, in addition to any percentage error, so measuring "12.35" can show "12.33" or "12.37" and it will all be the same, it is just the rightmost digit floating from one use to the next. Always be skeptical of meter errors.
Sounds like the SS Kludge Job has a mind of it's own.(G) What would a "24V" solar panel cost you, so you could at least charge both batteries at once?
Meters can have a float of +-2 or 3 LSD, in addition to any percentage error, so measuring "12.35" can show "12.33" or "12.37" and it will all be the same, it is just the rightmost digit floating from one use to the next. Always be skeptical of meter errors.
Sounds like the SS Kludge Job has a mind of it's own.(G) What would a "24V" solar panel cost you, so you could at least charge both batteries at once?