SailNet Community banner
1 - 2 of 2 Posts

·
Registered
Joined
·
407 Posts
I dunno. I have done video installations with 120 connectors on Belden 8281 75 ohm coax. 240 connectors spread across 4 racks from video patch bays to routers to my video servers. Each server required 5 BNCs (1 composite video, 3 component video and 1 blackburst timing). Cutting component video cables to exact lengths took as long as the connectors. Doing it by manually without a stripper would have been a nightmare
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top