Joined
·
43,281 Posts
- Reaction score
- 297
Umm... I would add the lead internally. 2800 lbs. of lead ballast only takes up about FOUR CUBIC FEET of space—so, you're looking at two-to-three cubic feet of lead to add, maybe 3.5 cubic feet at the most.
Why not remove the concrete from the encapsulated keel and replace some of it with lead.
You won't be able to laminate a lead shoe to the bottom of your boat with any degree of success IMHO. Lead is a relatively "slippery" material to work with and not much sticks to it with any degree of strength. By putting the ballast inside the boat, you'll eliminate the risk of the new ballast detaching suddenly.
Why not remove the concrete from the encapsulated keel and replace some of it with lead.
You won't be able to laminate a lead shoe to the bottom of your boat with any degree of success IMHO. Lead is a relatively "slippery" material to work with and not much sticks to it with any degree of strength. By putting the ballast inside the boat, you'll eliminate the risk of the new ballast detaching suddenly.