Joined
·
980 Posts
Anyone have any "tips" on splicing 1/2" Sta Set X line? I''ve downloaded the instructions from the NE Ropes website but working the unifid through the cover from "c" to "b" and having the core stay attached to the fid takes about 1/2hr and lots of straining. Plus the instructions in Step 6 are not all that clear to me. At $1.39 per ft I''ve gone thru about $20 of rope. Their must be an easier way!