SailNet Community banner
1 - 1 of 1 Posts

·
Tartan 37C
Joined
·
501 Posts
Once the weather get's a quite bit warmer my list includes:

Replacing cockpit drain hoses
Re-plumbing shower sump to run separate of bilge pump discharge
re-plumb galley sink drains
replacing all head hoses with next generation sanitary hoses
install new chain snubber
refinish interior teak with Watco teak Oil & varnish on hand grabs
installation of new depth-speed-temp transducer

and possibly install an A/C-heating unit

I'm sure I'll find many more projects as I work through this list
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top